top of page
Hershey Hall Seismic Renovation

SAA initially used BIM to prepare a programming and cost feasibility study for the adaptive reuse and historic rehabilitation of Mira Hershey Hall.  The feasibility study included programming of new scholarly support spaces, computer labs, meeting spaces, and faculty offices.  The programming and cost feasibility study anticipated seismic and accessibility upgrades for the full MHH renovation.

 

Mira Hershey Hall’s construction documents are BIM generated.  Robust consultant coordination of building systems, rapid schedule development and overall construction problem solving are among the several advantages of BIM.  Resolving coordination issues with BIM before construction translates directly to a smoother schedule and budget control. Furthermore, the model was used to perform an energy analysis using Autodesk’s Green Building Studio. This project was the first at UCLA to achieve a LEED NC Platinum rating.

Type: Institutional, Technical

Seismic Renovation & Adaptive reuse


47,000 SF
Architect: stenforS|Associates
Structural Engineers: Englekirk & Sabol
LEED Consultant: SAA

General Contractor: Icon West

Landscape A.: Katherine Spitz Associates, Inc.

MEP Engineering: M. Weber Associates

Electrical Engineering: ECCO Engineering

Status: Built

Related Projects
UCLA Jules Stein Eye Institute
Los Angeles, CA
Young Research Library
Los Angeles, CA
Wildwood School Study
Los Angeles, CA
bottom of page